Bristol Schools Phase 1A
The background
To successfully deliver first class education to more than 4,000 students, Bristol City Council launched a PFI scheme to replace Bristol Secondary Schools in urban communities in north and south Bristol.
The scheme was launched to address an urgent need for new and upgraded school buildings in Bristol as many of the secondary school facilities were inadequate and no longer met the learning needs of students. The schools also faced capacity constraints as the old buildings lacked flexibility, meaning that they were unable to accommodate the number of spaces required to facilitate a larger population of students.
Invesis were awarded the contract in 2004 to design, build, finance and maintain 4 secondary schools. By partnering with Invesis Bristol City Council were able to deliver modern, adaptable and spacious teaching and learning environments.
Client
Bristol City Council
Capital Value
€90m
Sponsor/Investor
Invesis
Consortium
Bristol Schools Ltd
Engineering, Procurement and Construction (EPC)
BAM Construction
Operations and Maintenance (O&M)
BAM FM
Business value
At the beginning of the partnership, Invesis embarked on a consultation exercise with the Council, our partners and the schools to ensure that the reference designs could be optimised to incorporate a high degree of adaptability and flexibility, to allow for future changes in department sizes.
One of the schools was built on a site of archaeological interest, which proved to be a challenge during the construction phase. Invesis alongside our partners, worked closely with the local Planning Department and archaeological specialists to ensure findings were uncovered carefully and recorded.
The project has been operational for 17 years and throughout its lifecycle, we have worked cohesively and transparently with BAM FM to ensure that the schools are maintained to the highest-level of operation, aesthetic appearance, safety and energy conservation.
Key features
By using the PFI model and partnering with Invesis, the project…
- delivered on time and in immaculate condition
- was well-designed incorporating teaching spaces that make good and appropriate use of natural light and ventilation combined with solar control glazing and lighting controls
- has benefited greatly from its energy consumption being monitored remotely in real time, enabling our maintenance partners to identify trends and any unplanned increases to take action, reducing costs and the carbon footprint of the concession